Apartment Updates

Work is progressing slowly in the downstairs units as we are busy taking care of little Desmond upstairs. All the walls are painted, doors have been put in. The subway tiles we chose for the bathrooms are up on the walls, the floor tiles should be finished this week. The kitchen cabinets we purchased two weeks ago were delivered yesterday, they now sit in one of the apartments waiting to be installed.

We chose two panel doors for both units.

The old double hung windows got a face lift. New coat of paint and new casing. 

Front unit bathroom with white subway tiles and black border trim pieces.

We decided to go with a octagon black and white floor tile for a classic look. I am a little worry that they might look too busy in a small bathroom. I hope I won't regret it. 

Wall tiles for the back unit which will have a clawfoot tub that came with house.


Justin and I made a quick trip to Ikea couple of days ago and bought all the lighting fixtures for the apartments. Justin is going to install them this week, whenever he finds some free time in between changing dirty diapers and doing house hold chores...Eight light fixtures, total cost about $200, can't beat that!

Lillholmen bathroom light.

Lock hallway ceiling light.
 Tidig kitchen ceiling track lighting. We got the one with 3 track lights. 

Erbium living room ceiling light.  

Comments

Popular Posts